The Stroudwater canal in Gloucestershire was built in the 1770s. It brought coal to the mills along the Stroud valleys, which had become an important centre for the manufacture of woollen cloth, but the arrival of the railways in the mid 19th century led to the canal's decline and eventual abandonment. A mile-long section of it was filled in when the M5 motorway was built in the 1960s, cutting the canal off from the rest of the inland waterways network. Now ambitious multi-million plans are underway to restore and re-open the "missing mile" and reconnect the canal. ...
Pas encore de transcription pour cet épisode
Vous pouvez tout de même l'écouter dans le lecteur. Sur les épisodes transcrits, touchez n'importe quel mot pour voir son sens.
