Episode 256: A Very Old Dream
AZ: The History of Arizona podcast

Episode 256: A Very Old Dream

B2Obere Mittelstufe11. Mai 202628 Min.
  • Geschichte

The Central Arizona Project became a reality within our lifetimes and today delivers water to Maricopa and Pinal counties. But the genesis for such an idea actually goes back nearly a century. And the real fight to get the thing built would start in the latter end of the 1940s, as Carl Hayden made it his mission to bring Colorado River water to central Arizona.

Folge abspielen

Öffnet den Player: das vollständige Transkript, jedes Wort anklickbar, mit Übersetzung und Karteikarten.

Probieren Sie es: Tippen Sie auf ein Wort

Echte Sätze vom Anfang dieser Folge. Jedes Wort ist mit seinem Niveau markiert.

Satz 1 von 12 · 0:00

I've driven back and forth between California and Arizona a few times in just the last few months

Tippen Sie auf ein Wort, um seine Bedeutung in Ihrer Sprache zu sehen.

Kennen Sie diese Wörter?

8 schwierigere Wörter aus dieser Folge. Tippen Sie auf eines, um die Bedeutung zu sehen, und markieren Sie es dann.

Markieren Sie ein paar Wörter, und wir sagen Ihnen, wie gut diese Folge zu Ihrem Niveau passt.

Passt diese Folge zu Ihnen?

B2

B2 · Obere Mittelstufe

Angenehm, wenn Sie schon Fernsehnachrichten folgen

A1 10 %A2 18 %B1 39 %B2 24 %C1 9 %
  • 67 % der Wörter sind B1 oder leichter.
  • 147 Wörter pro Minute: ein natürliches Tempo.
  • 166 schwierigere Wörter (ab B2) in der ganzen Folge.

Transkript

Der Anfang der Folge. Das ganze Transkript ist im Player.

0:00

Music I've driven back and forth between California and Arizona a few times in just the last few months and there is one thing that has stood out to me every time. A little over 30 miles east of Quartzsite you pass over a large concrete line canal with a helpful sign before it letting

0:29

you know that this is the Hayden Rose Aqueduct. Maybe it's because I've been doing this podcast for so long, or because I've covered both those names recently, but the combination of Hayden and Rhodes stood out to me immediately. This is not going to shock anybody, but this canal is part of this Central Arizona project, one of the largest, most expensive aqueduct projects

0:56

ever constructed in the whole of the United States. And the names on the canal should tell us who exactly was trying to get this project approved at the congressional level. What that sign won't tell you, however, is the long convoluted fight that happened in the courts and at the highest levels of government before that canal could become a reality.

Das war der Anfang. Der Rest der Folge (27 Min.) ist im Player: jedes Wort anklickbar, mit Übersetzung, gespeicherten Wörtern und Karteikarten.

Im Player weiterhören

Automatisch aus dem Audio erstellt. Kann Fehler enthalten. Das Audio gehört seinem Herausgeber und wird aus dessen Feed abgespielt. Rechteinhaber können eine Entfernung beantragen — Urheberrechts- und Entfernungsrichtlinie